New Brighton route (Wirral Line) incident details (previous month)

back to main page

RouteNew BrightonLineWirral
Date / Time Reported2025-04-10 14:09:54Cancellations to services from New Brighton
Date / Time Resolved2025-04-10 13:30:03
Due to thick smoke affecting services earlier between Hamilton Square and James Street the Wirral line is disrupted. Disruption is expected until 14:45 10/04. Impact: Train services from New Brighton are returning to normal but some services will still be cancelled or delayed. Additional Information: A Rail Replacement bus service is in operation to run between Birkenhead Central and Moorfields and Birkenhead North and Moorfields. Ticket accepance with Arriva and Transport For Wales currently in place.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-10 13:43:13Alterations to services from New Brighton
Date / Time Resolved2025-04-10 13:15:02
Due to thick smoke affecting services between Hamilton Square and James Street the Wirral line is disrupted. Disruption is expected until 15:30 10/04. Impact: Train services from New Brighton will be terminated at and started back from Birkenhead North. Additional Information: A Rail Replacement bus service is in operation to run between Birkenhead Central and Moorfields and Birkenhead North and Moorfields. Ticket accepance with Arriva and Transport For Wales currently in place.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-10 13:28:07Alterations to services from New Brighton
Date / Time Resolved2025-04-10 12:50:02
Due to thick smoke affecting services between Hamilton Square and James Street the Wirral line is disrupted. Disruption is expected until 13:45 10/04. Impact: Train services from New Brighton will be terminated at and started back from Birkenhead North. Additional Information: A Rail Replacement bus service has been requested to run between Birkenhead Central and Moorfields and Birkenhead North and Moorfields. Ticket accepance with Arriva and Transport For Wales currently in place.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-10 13:12:00Alterations to services from New Brighton
Date / Time Resolved2025-04-10 12:30:02
Due to thick smoke affecting services between Hamilton Square and James Street the Wirral line is disrupted. Disruption is expected until 13:45 10/04. Impact: Train services from New Brighton will be terminated at and started back from Birkenhead North. Additional Information: A Rail Replacement bus service has been requested to run between Birkenhead Central and Moorfields and Birkenhead North and Moorfields, this is currently not in operation. Ticket accepance with Arriva and Transport For Wales currently in place.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-10 12:58:18Alterations to services from New Brighton
Date / Time Resolved2025-04-10 12:15:01
Due to thick smoke affecting services between Hamilton Square and James Street the Wirral line is disrupted. Disruption is expected until 13:45 10/04. Impact: Train services from New Brighton will be terminated at and started back from Birkenhead North. Additional Information: A Rail Replacement bus service has been requested to run between Birkenhead Central and Moorfields and Birkenhead North and Moorfields, this is currently not in operation. Ticket accepance with Arriva currently in place.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-10 12:50:01Alterations to services from New Brighton
Date / Time Resolved2025-04-10 12:05:02
Due to thick smoke affecting services between Hamilton Square and James Street the Wirral line is disrupted. Disruption is expected until 13:45 10/04. Impact: Train services from New Brighton may be terminated at and started back from Birkenhead North. Additional Information: A Rail Replacement bus service has been requested to run between Birkenhead Central and Moorfields and Birkenhead North and Moorfields, this is currently not in operation


RouteNew BrightonLineWirral
Date / Time Reported2025-04-10 12:44:22Alterations to services from New Brighton
Date / Time Resolved2025-04-10 11:55:02
Due to thick smoke affecting services between Hamilton Square and James Street the Wirral line is disrupted. Disruption is expected until 13:45 10/04. Impact: Train services from New Brighton may be terminated at and started back from Birkenhead North.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-10 12:27:09Cancellations to services from New Brighton
Date / Time Resolved2025-04-10 11:50:02
Due to thick smoke affecting services between Hamilton Square and James Street the Wirral line is disrupted. Disruption is expected until 13:30 10/04. Impact: Train services from New Brighton may be cancelled or delayed.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-02 10:01:11Cancellations to services to New Brighton
Date / Time Resolved2025-04-02 09:35:02
Due to power supply problems between Hamilton Square and Birkenhead North the West Kirby and New Brighton line is disrupted. Disruption is expected until 11:00 02/04. Impact: Train services to New Brighton are returning to normal but some services may still be cancelled or delayed.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-02 09:03:08Alterations to services to New Brighton
Date / Time Resolved2025-04-02 09:05:02
Due to power supply problems between Hamilton Square and Birkenhead North the West Kirby and New Brighton line is disrupted. Disruption is expected until 11:00 02/04. Impact: Train services to New Brighton will be terminated at and started back from Birkenhead North. Customer Advice: Replacement road transport services are conveying passengers between Hamilton Square and Birkenhead North in both directions until further notice. Additional Information: Passengers are advised to board any Wirral Line train and change at Hamilton Square for a rail replacement bus service. Ticket acceptance is now in place for Arriva buses until 10am.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-02 08:07:39Alterations to services to New Brighton
Date / Time Resolved2025-04-02 08:05:02
Due to power supply problems between Hamilton Square and Birkenhead North the West Kirby and New Brighton line is disrupted. Disruption is expected until 10:00 02/04. Impact: Train services to New Brighton will be terminated at and started back from Birkenhead North. Customer Advice: Replacement road transport services are conveying passengers between Hamilton Square and Birkenhead North in both directions until further notice. Additional Information: Passengers are advised to board any Wirral Line train and change at Hamilton Square for a rail replacement bus service. Ticket acceptance is now in place for Arriva buses until 10am.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-02 07:53:35Alterations to services to New Brighton
Date / Time Resolved2025-04-02 07:10:02
Due to power supply problems between Hamilton Square and Birkenhead North the West Kirby and New Brighton line is disrupted. Disruption is expected until 10:00 02/04. Impact: Train services to New Brighton will be terminated at and started back from Birkenhead North. Customer Advice: Replacement road transport services are conveying passengers between Hamilton Square and Birkenhead North in both directions until further notice. Additional Information: Passengers are advised to board any Wirral Line train and change at Hamilton Square for a rail replacement bus service.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-02 07:38:13Alterations to services to New Brighton
Date / Time Resolved2025-04-02 06:55:02
Due to power supply problems between Hamilton Square and Birkenhead North the West Kirby and New Brighton line is disrupted. Disruption is expected until 10:00 02/04. Impact: Train services to New Brighton will be terminated at and started back from Birkenhead North. Customer Advice: Replacement road transport services are conveying passengers between Hamilton Square and Birkenhead North in both directions until further notice. Additional Information: Passengers are advised to board any Wirral Line train and change at Hamilton Square for a rail replacement bus service.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-02 07:29:49Alterations to services to New Brighton
Date / Time Resolved2025-04-02 06:40:02
Due to power supply problems between Hamilton Square and Birkenhead North the West Kirby and New Brighton line is disrupted. Disruption is expected until 09:00 02/04. Impact: Train services to New Brighton will be terminated at and started back from Birkenhead North. Customer Advice: Replacement road transport services are conveying passengers between Hamilton Square and Birkenhead North in both directions until further notice. Additional Information: Passengers are advised to board any Wirral Line train and change at Hamilton Square for a rail replacement bus service.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-02 06:59:46Alterations to services to New Brighton
Date / Time Resolved2025-04-02 06:35:02
Due to power supply problems between Hamilton Square and Birkenhead North the West Kirby and New Brighton line is disrupted. Disruption is expected until 08:00 02/04. Impact: Train services to New Brighton will be terminated at and started back from Birkenhead North. Customer Advice: Replacement road transport services are conveying passengers between Hamilton Square and Birkenhead North in both directions until further notice. Additional Information: Passengers are advised to board any Wirral Line train and change at Hamilton Square for a rail replacement bus service.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-02 06:44:36Alterations to services to New Brighton
Date / Time Resolved2025-04-02 06:05:02
Due to power supply problems between Hamilton Square and Birkenhead North the West Kirby and New Brighton line is disrupted. Disruption is expected until 08:00 02/04. Impact: Train services to New Brighton will be terminated at and started back from Birkenhead North. Customer Advice: Replacement road transport services are conveying passengers between Hamilton Square and Birkenhead North in both directions until further notice. Additional Information: Passengers are advised to board any Wirral Line train and change at Hamilton Square for a rail replacement bus service.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-02 06:29:48Alterations to services to New Brighton
Date / Time Resolved2025-04-02 05:50:02
Due to power supply problems between Hamilton Square and Birkenhead North the West Kirby and New Brighton line is disrupted. Disruption is expected until 07:30 02/04. Impact: Train services to New Brighton will be terminated at and started back from Birkenhead North. Customer Advice: Replacement road transport services are conveying passengers between Hamilton Square and Birkenhead North in both directions until further notice. Additional Information: Passengers are advised to board any Wirral Line train and change at Hamilton Square for a rail replacement bus service.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-02 06:23:34Alterations to services to New Brighton
Date / Time Resolved2025-04-02 05:35:02
Due to power supply problems between Hamilton Square and Birkenhead North the West Kirby and New Brighton line is disrupted. Disruption is expected until 07:30 02/04. Impact: Train services to New Brighton will be terminated at and started back from Birkenhead North. Customer Advice: Rail replacement buses have been requested to operate between Hamilton Square and Birkenhead North however these are not yet in operation. Additional Information: Passengers are advised to board any Wirral Line train and change at Hamilton Square for a rail replacement bus service.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-02 06:21:53Alterations to services to New Brighton
Date / Time Resolved2025-04-02 05:30:02
Due to power supply problems between Hamilton Square and Birkenhead North the West Kirby and New Brighton line is disrupted. Disruption is expected until 07:00 02/04. Impact: Train services to New Brighton will be terminated at and started back from Birkenhead North. Customer Advice: Rail replacement buses have been requested to operate between Hamilton Square and Birkenhead North however these are not yet in operation. Additional Information: Passengers are advised to board any Wirral Line train and change at Hamilton Square for a rail replacement bus service.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-02 06:14:44Cancellations to services to New Brighton
Date / Time Resolved2025-04-02 05:25:02
Due to power supply problems between Hamilton Square and Birkenhead North the West Kirby and New Brighton line is disrupted. Disruption is expected until 07:00 02/04. Impact: Train services to New Brighton may be cancelled, delayed or terminated at Liverpool Central Wirral. Customer Advice: Rail replacement buses have been requested to operate between Hamilton Square and Birkenhead North however these are not yet in operation. Additional Information: Passengers are advised to board any Wirral Line train and change at Hamilton Square for a rail replacement bus service.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-02 06:01:06Cancellations to services to New Brighton
Date / Time Resolved2025-04-02 05:20:02
Due to power supply problems between Hamilton Square and Birkenhead North the West Kirby and New Brighton line is disrupted. Disruption is expected until 07:00 02/04. Impact: Train services to New Brighton may be cancelled, delayed or terminated at Liverpool Central Wirral. Customer Advice: Rail replacement buses have been requested to operate between Hamilton Square and Birkenhead North however these are not yet in operation.


RouteNew BrightonLineWirral
Date / Time Reported2025-04-02 05:46:03Cancellations to services to New Brighton
Date / Time Resolved2025-04-02 05:05:01
Due to power supply problems between Birkenhead North and Hamilton Square the West Kirby and New Brighton line is disrupted. Disruption is expected until 06:45 02/04. Impact: Train services to New Brighton may be cancelled or delayed.


RouteNew BrightonLineWirral
Date / Time Reported2025-03-22 12:26:41Cancellations to services from New Brighton
Date / Time Resolved2025-03-22 13:05:02
Due to failure of the electricity supply between James Street and Hamilton Square the Wirral line is disrupted. Disruption is expected until 13:00 22/03. Impact: Train services from New Brighton are returning to normal but some services may still be cancelled or delayed. Additional Information: Ticket Acceptance is also available on Arriva Bus services until 1330.


RouteNew BrightonLineWirral
Date / Time Reported2025-03-22 11:57:37Alterations to services from New Brighton
Date / Time Resolved2025-03-22 12:35:01
Due to failure of the electricity supply between James Street and Hamilton Square the Wirral line is disrupted. Disruption is expected until 13:00 22/03. Impact: Train services from New Brighton will be terminated at and started back from Birkenhead North. Customer Advice: Replacement road transport services are conveying passengers between Moorfields and Birkenhead North in both directions until further notice. Additional Information: Ticket Acceptance is also available on Arriva Bus services until 1330.


RouteNew BrightonLineWirral
Date / Time Reported2025-03-22 11:45:30Alterations to services from New Brighton
Date / Time Resolved2025-03-22 12:00:02
Due to failure of the electricity supply between James Street and Hamilton Square the Wirral line is disrupted. Disruption is expected until 13:00 22/03. Impact: Train services from New Brighton will be terminated at and started back from Birkenhead North. Customer Advice: Replacement road transport services are conveying passengers between Moorfields and Birkenhead North in both directions until further notice. Additional Information: Ticket Acceptance is also available on Arriva Bus services.


RouteNew BrightonLineWirral
Date / Time Reported2025-03-22 11:20:51Alterations to services from New Brighton
Date / Time Resolved2025-03-22 11:50:01
Due to failure of the electricity supply between James Street and Hamilton Square the Wirral line is disrupted. Disruption is expected until 12:30 22/03. Impact: Train services from New Brighton will be terminated at and started back from Birkenhead North. Customer Advice: Replacement road transport services are conveying passengers between Moorfields and Birkenhead North in both directions until further notice. Additional Information: Ticket Acceptance is also available on Arriva Bus services.


RouteNew BrightonLineWirral
Date / Time Reported2025-03-22 11:00:27Alterations to services from New Brighton
Date / Time Resolved2025-03-22 11:25:02
Due to failure of the electricity supply between James Street and Hamilton Square the Wirral line is disrupted. Disruption is expected until 12:30 22/03. Impact: Train services from New Brighton will be terminated at and started back from Birkenhead North. Additional Information: Ticket acceptance is in place with Transport for Wales on their services between Liverpool and Chester in both directions. A rail replacement bus service is operating between Birkenhead North / Birkenhead Central and Liverpool in both directions. Ticket Acceptance is also available on Arriva Bus services until 12.30.


RouteNew BrightonLineWirral
Date / Time Reported2025-03-22 10:31:53Alterations to services from New Brighton
Date / Time Resolved2025-03-22 11:05:02
Due to failure of the electricity supply between James Street and Hamilton Square the Wirral line is disrupted. Disruption is expected until 12:30 22/03. Impact: Train services from New Brighton will be terminated at and started back from Birkenhead North. Additional Information: Ticket acceptance is in place with Transport for Wales on their services between Liverpool and Chester and vice-versa, a rail replacement bus service is operating between Birkenhead North / Birkenhead Central and Liverpool. Ticket Acceptance is in place with Arriva Buses until 12.30pm


RouteNew BrightonLineWirral
Date / Time Reported2025-03-22 09:34:22Alterations to services from New Brighton
Date / Time Resolved2025-03-22 10:35:02
Due to failure of the electricity supply between James Street and Hamilton Square the Wirral line is disrupted. Disruption is expected until 12:30 22/03. Impact: Train services from New Brighton will be terminated at and started back from Birkenhead North. Additional Information: Ticket acceptance is in place with Transport for Wales on their services between Liverpool and Chester and vice-versa, a rail replacement bus service has been requested to run between Birkenhead North / Birkenhead Central and Liverpool. Ticket Acceptance is in place with Arriva Buses until 12.30pm


RouteNew BrightonLineWirral
Date / Time Reported2025-03-22 08:53:28Alterations to services from New Brighton
Date / Time Resolved2025-03-22 09:40:02
Due to failure of the electricity supply between James Street and Hamilton Square the Wirral line is disrupted. Disruption is expected until 13:00 22/03. Impact: Train services from New Brighton will be terminated at and started back from Birkenhead North. Additional Information: Ticket acceptance is in place with Transport for Wales on their services between Liverpool and Chester and vice-versa, a rail replacement bus service has been requested to run between Birkenhead North / Birkenhead Central and Liverpool. Ticket Acceptance is in place with Arriva Buses until 12.30pm


RouteNew BrightonLineWirral
Date / Time Reported2025-03-22 08:24:08Alterations to services from New Brighton
Date / Time Resolved2025-03-22 09:00:03
Due to failure of the electricity supply between James Street and Hamilton Square the Wirral line is disrupted. Disruption is expected until 10:00 22/03. Impact: Train services from New Brighton will be terminated at and started back from Birkenhead North. Additional Information: Ticket acceptance is in place with Transport for Wales on their services between Liverpool and Chester and vice-versa, a rail replacement bus service has been requested to run between Birkenhead North / Birkenhead Central and Liverpool. Ticket Acceptance with Arriva buses also in place


RouteNew BrightonLineWirral
Date / Time Reported2025-03-22 07:32:23Alterations to services from New Brighton
Date / Time Resolved2025-03-22 08:25:02
Due to failure of the electricity supply between James Street and Hamilton Square the Wirral line is disrupted. Disruption is expected until 10:00 22/03. Impact: Train services from New Brighton will be terminated at and started back from Birkenhead North. Additional Information: Ticket acceptance is in place with Transport for Wales on their services between Liverpool and Chester and vice-versa, a rail replacement bus service has been requested to run between Birkenhead North / Birkenhead Central and Liverpool


RouteNew BrightonLineWirral
Date / Time Reported2025-03-22 06:11:40Alterations to services from New Brighton
Date / Time Resolved2025-03-22 07:35:02
Due to failure of the electricity supply between James Street and Hamilton Square the Wirral line is disrupted. Disruption is expected until 08:00 22/03. Impact: Train services from New Brighton will be terminated at and started back from Birkenhead North. Additional Information: Ticket acceptance is in place with Transport for Wales on their services between Liverpool and Chester and vice-versa, a rail replacement bus service has been requested to run between Birkenhead North / Birkenhead Central and Liverpool


RouteNew BrightonLineWirral
Date / Time Reported2025-03-22 05:45:17Alterations to services from New Brighton
Date / Time Resolved2025-03-22 06:15:02
Due to failure of the electricity supply between James Street and Hamilton Square the Wirral line is disrupted. Disruption is expected until 08:00 22/03. Impact: Train services from New Brighton will be terminated at and started back from Birkenhead North. Additional Information: Ticket acceptance is in place with Transport for Wales on their services between Liverpool and Chester and vice-versa, a rail replacement bus service has been requested to run between Birkenhead North / Birkenhead Central and Liverpool but is not yet in operation.


RouteNew BrightonLineWirral
Date / Time Reported2025-03-22 05:32:49Alterations to services from New Brighton
Date / Time Resolved2025-03-22 05:50:02
Due to failure of the electricity supply between James Street and Hamilton Square the Wirral line is disrupted. Disruption is expected until 08:00 22/03. Impact: Train services from New Brighton will be terminated at and started back from Birkenhead North. Additional Information: Ticket acceptance is in place with Transport for Wales on their services between Liverpool and Chester and vice-versa, a rail replacement bus service has been requested to run between Birkenhead North / Birkenhead Central and Liverpool but is not yet in operation.